Civil Works & Site Preparation

Site Preparation for Land Wells

Planning
  1. access tracks.
  2. cellar construction.
  3. location conductor.
  4. water supply.

 

Access Tracks

Preparation of access tracks includes the:

  1. construction of access tracks to the location.
  2. preparation and levelling of site to accommodate all drilling/workover equipment including auxiliary services.
  3. spraying water/crude oil on access and location.
Cellar Construction

Preparation of a cellar includes:

  1. excavation and construction of a well cellar to Company specifications.
Location Conductor

Preparation of a location conductor includes:

  1. drilling, setting 20in or 30in conductor (40 ft) and cementing in place.
Water Supply

Preparation of a water supply includes:

  1. drilling two water wells to a maximum of 300 ft on each new location
  2. testing water wells with electrical submersible pump to access deliverability.